Reid Crowther has undertaken a large variety of water projects, these include the major assignments undertaken either directly for the local governments or funded through the World Bank or other Donor agencies, some of the project completed by Reid Crowther include:

  • Dibi Regional Water Supply System - Detail design of a 500,000 L/d water treatment plant to service 6 communities and an oil service facility in the Niger Delta, Reid Crowther undertook the complete design and procurement documentation. The Project is currently in the procurement phase.

    Dibi Regional Water Supply Artists Impression

  • Lagos State Water Corporation - Design of water distribution system expansion for the City of Lagos in Nigeria, the project involved detailed design of 2,100 kms. of water main ranging in diameter 100 mm to 1200 mm.
  • Federal Capital Territory Water Board - Investigation into the existing water supply system to serve Abuja, Reid Crowther undertook a system condition evaluation for the water system serving the Federal Capital Territory. in Nigeria.
  • Adagbraza Regional Water Supply System - Detail design of a 200,000 L/d water treatment plant to service 2 communities in the banks of the Benue River, Reid Crowther undertook the complete design and procurement documentation. Project is currently in the procurement phase.
  • Water Contamination investigations, Ikoyi Apartments, Shell Trustees - Reid Crowther investigated and developed solutions to remedy the water contamination problems being experienced in this luxury block of flats in Ikoyi.
  • Benikrukru Water Supply System - Detail design of a 500,000 L/d water treatment plant to service the communities in the Niger Delta, Reid Crowther undertook the complete design and procurement documentation. Project is complete and operational.
  • Dar-es-Salam, Lower Ruvu Water Plant, Tanzania - Reid Crowther carried out the initial investigation of the rehabilitation required for this facility; a rehabilitation report was prepared for submission to the African Development Bank.
  • Basuto Water Supply Project, Tanzania - Reid Crowther undertook the design of water supply system to serve 9 farming communities in central Tanzania. Reid Crowther staff carried out detailed survey and design in Tanzania for 40 km of pipelines and six groundwater facilities. Following the design, tender documents and materials procurement documentation were prepared for subsequent completion by CIDA.
  • Makaraba Regional Water Supply System - Detail design of a 200,000 L/d water treatment plant to service 2 communities and an oil service facility in the Niger Delta, Reid Crowther undertook the complete design and procurement documentation. Project is currently in the procurement phase.
  • Olero Creek Regional Water Supply System - Detail design of a 500,000 L/d water treatment plant to service 8 communities and an oil service facility in the Niger Delta, Reid Crowther undertook the complete design and procurement documentation. Project is currently in the construction phase.
  • Kingston and Environs, Jamaica - Reid Crowther evaluated the condition of nine separate treatment plants. The plant sizes ranged from 0.08 Mg/d to 1.5 Mg/d. The evaluation included all aspects of the plant process and operation with recommendations being prepared for upgrading and improvements in both the plants and method of operation.
  • Asset Management Plan 3, (AMP 3) Southern Water, UK - Reid Crowther personnel acted as team leaders and data collectors for this project.
  • Asset Management Plan 2, (AMP 2) South West Water Services, UK - Reid Crowther personnel acted as team leaders and data collectors for this project. Also working on the development plan and financial planning for the Water Company to enable the appropriate budgets to be agreed with OFWAT.